A complete build programme: groundworks, brickwork, roofing, services, and finishing. Five courses that take you from planning permission to a room you can actually use.
Phase 1 of 5
Groundworks & Foundations
Excavate, set up formwork, pour concrete footings, and lay the floor slab.
Phase 2 of 5
Brickwork & Blockwork
Build the dwarf wall, piers, and window openings to DPC level.
Phase 3 of 5
Roof Frame & Glazing
Install the ridge, rafters, purlins, and polycarbonate or glass panels.
Phase 4 of 5
Electrics & Plumbing
First-fix wiring, sockets, lighting circuit, and a radiator spur.
conservatory electrics
Coming soon
Phase 5 of 5
Plastering, Flooring & Finishing
Render the dwarf wall, lay floor tiles, hang the door, and paint everything out.
conservatory finishing
Coming soon